This feature introduces the Original Required field to Job Schedules within Zenople. It ensures that users can view and manage the initially required number of resources for a job schedule, even when subsequent changes occur.
Why it matters:
- Provides clarity on the original staffing requirement for better planning and auditing.
- Enhances transparency and accuracy in job scheduling.
Key Benefits:
- Efficiency: Users can quickly identify the original requirement without confusion.
- Accuracy: Maintains historical reference for staffing needs.
- Compliance: Prevents saving invalid values (e.g., zero) for original requirements.
Functionality
- Feature Addition
- Location in Zenople:
- JSM > Schedule Navigation
- JSM > Grid View
- CMS > Job & Assignment > Schedule Job
- New Element:
- Original Required field added to schedule forms.
- Location in Zenople:
- Behavior
- When adding an assignment schedule:
- The Required value is automatically copied to Original Required.
- When editing the schedule:
- Changes to Required do not affect Original Required.
- Validation:
- Original Required cannot be zero.
- If the user attempts to save with Original Required = 0, an error message displays:
“Must be greater than 0.”
- When adding an assignment schedule:
- Applicability
- Applies to Job Schedulingwithin:
- JSM (Job Schedule Management)
- CMS (Customer Management System)
- Applies to Job Schedulingwithin: