--- title: "Introduced Original Required Field in Job Schedules" slug: "introduced-original-required-field-in-job-schedules" tags: ["V-26-Feburary"] updated: 2026-01-30T05:23:41Z published: 2026-01-30T05:24:26Z canonical: "zenoplesupport.aqore.com/introduced-original-required-field-in-job-schedules" --- > ## Documentation Index > Fetch the complete documentation index at: https://zenoplesupport.aqore.com/llms.txt > Use this file to discover all available pages before exploring further. # Introduced Original Required Field in Job Schedules This feature introduces the **Original Required** field to Job Schedules within Zenople. It ensures that users can view and manage the initially required number of resources for a job schedule, even when subsequent changes occur. **Why it matters:** - Provides clarity on the original staffing requirement for better planning and auditing. - Enhances transparency and accuracy in job scheduling. **Key Benefits:** - **Efficiency:** Users can quickly identify the original requirement without confusion. - **Accuracy:** Maintains historical reference for staffing needs. - **Compliance:** Prevents saving invalid values (e.g., zero) for original requirements. #### Functionality 1. **Feature Addition** - **Location in Zenople:** - **JSM > Schedule Navigation** - **JSM > Grid View** - **CMS > Job & Assignment > Schedule Job** - **New Element:** - **Original Required** field added to schedule forms. 2. **Behavior** - When adding an assignment schedule: - The **Required** value is automatically copied to **Original Required**. - When editing the schedule: - Changes to **Required** do not affect **Original Required**. - Validation: - **Original Required** cannot be zero. - If the user attempts to save with **Original Required = 0**, an error message displays: *“Must be greater than 0.”* 3. **Applicability** - Applies to **Job Scheduling**within: - **JSM (Job Schedule Management)** - **CMS (Customer Management System)**